Pier 6 crossing
Problem
The only line wide enough for the orbital alignment ran straight through a working shipyard, whose cranes were contractually protected until 2031.
Drawing
We moved the alignment 400 m inland and took the gradient up to 3.1%, which put the level crossing elimination out of scope and saved the pier its cranes.